info@baniql.com

About us

Extracting nickel for lithium-ion batteries in an environmentally responsible manner

We are a technology company integrating electrochemistry principles with an advanced mechanical reactor design to improve the nickel extraction process without the need for high temperature and high pressure. BEST™ (Baniql Extraction SysTem) uses our patent-pending engineering design to maximize the leaching process. As a result, we use less energy, less water, and produce net-zero toxic waste.

US$0.0M

Raised across pre-seed and seed rounds

0

Patents — one published by USPTO, one pending

0 sqft

Production facility in Indonesia

0 kg/mo

Nickel sulfate pre-pilot capacity

The BANIQL team

Who we are

A diverse team of experts in chemistry, engineering and operations

Patented technology

Our highly diverse team of experts has developed a unique process and methodology for extracting metals without a significant environmental impact.

Direct access to resource

BANIQL has a dedicated resource scouting for nickel ore in Indonesia, working with the most prominent mining companies and building lasting relationships.

Our advantages

BANiQL excels in patented tech, strategic partnerships, and production of high-purity nickel products

Patented Technology

Innovative chemistry and process, with a published patent and another patent pending.

Strategic Partnerships

Commitment to provide feedback on sample performance through partner labs and a network of third-party analytical labs in South Korea.

Supply Chain

Secured over 20 tonnes of nickel ore supply from Indonesia and samples from the Philippines for research and development.

Production Capabilities

Completed construction of our 100 kg/month pre-pilot plant in Q4 2024, with trial productions currently underway.

Technology Licensing

Leveraging our patents for future joint ventures and licensing as our go-to-market strategy.

Our history

From a backyard experiment to a pre-pilot plant

Three years from first principles to trial production — every step validated by third parties.

  1. Jan 2021

    Willy's backyard

    First extraction experiments begin.

  2. Oct 2021

    BANIQL Corp. incorporated

    Incorporated in California.

  3. Nov 2021

    Patent search

    Comprehensive patent search report completed for our core idea.

  4. Jan 2022

    First lab

    Opened our first lab in Santa Clara, CA.

  5. May 2022

    Second lab

    Moved to a second, larger lab in Santa Clara, CA.

  6. Jul 2022

    First patent filed

    Filed our first patent for the BEST chemistry and process.

  7. Dec 2022

    MVP validated

    MVP samples successfully evaluated by a third party in South Korea.

  8. Feb 2023

    Delaware holding

    BANIQL Corp. Delaware holding established.

  9. Jul 2023

    Patent published

    First patent published by the USPTO.

  10. Sep 2023

    Climate Impact Innovations Challenge

    Won the inaugural challenge, with a 2.5 billion IDR grant from Temasek Foundation and East Ventures.

  11. Jan–Apr 2024

    Series seed

    Secured a US$1.65M series seed round led by BEENEXT.

  12. Mar 2024

    Production facility

    Secured a 10,500 sqft warehouse and built our 100 kg/month pre-pilot plant.

Achievements over 24 months

Our achievements

Funding

  • Raised a total of US$2.1M in pre-seed and seed rounds
  • Secured investments from BEENEXT, A2D, Seedstars, Sopoong, XA Network and angel investors
  • 2.5 billion IDR grant from Temasek Foundation in September 2023

Technology

  • Developed and filed patent for new chemistry and process
  • Achieved 99.7% nickel sulfate purity with BEST (TRL 4)

Team

  • Tripled our team in 9 months across chemistry, engineering and EHS
  • Established partnership with ROV Co Ltd
  • Built our board of advisors (7 key members)

Scale Up

  • Expanded operations to Indonesia
  • Established a 10,500 sqft facility
  • Set up and built a 100 kg/month nickel sulfate pre-pilot within seven months

Go-to-Market

  • Signed an LOI to purchase 5 tons/month of nickel sulfate
  • Monetized our metrology capabilities

Our team

Meet our dedicated team members

Eric Januar

Eric Januar

CEO & Co-Founder

Willy Halim

Willy Halim

CTO & Co-Founder

Seung Wan Kim

Seung Wan Kim

COO & Co-Founder

Aristotle Vergara

Aristotle Vergara

Facility Director & Co-Founder

Magdalena Quezada

Magdalena Quezada

Scientist

Jason Djuandy

Jason Djuandy

Data Engineer

Advisory board

Alan Pangbourne, ICD.D

Alan Pangbourne, ICD.D

Technical Advisor — Ops, Business Strategy

Prof. Gisele Azimi, Ph.D., P.Eng.

Prof. Gisele Azimi, Ph.D., P.Eng.

Technoeconomic Analysis, LCA and R&D

Audrey Fages

Audrey Fages

Finance, Operations

Ankit Upadhyay

Ankit Upadhyay

Strategy and Operations

Backed by

  • BEENEXT
  • A2D Ventures
  • Seedstars
  • Sopoong Ventures
  • XA Network
  • 500 Global

Partners & sponsors

  • Temasek Foundation
  • East Ventures
  • ROV Co Ltd
  • University of Toronto
  • Microsoft
  • BHS Law

Contact us

Reach out to learn more about BANiQL.

Get in touch to learn more about the Baniql Process, get samples, and discuss opportunities to be part of our journey.

Get in touch